(This is long and rambly and I apologize--it's late here, but I really wanted to give my two cents. If there was one valuable thing I learned in my degree, "how to work in a team" is it. And I didn't realize
how valuable that was until I got to my current job and watched my coworkers struggle with it. Here's some of my thoughts on the matter--they might be worth what you paid for them XD)
Step One: figure out if you really need a "team."
I know that might sound crazy--but Harlekin is, in a lot of ways, right. A lot of people on this forum have a very specific vision for their game, and working solo is the simplest way to retain complete creative control over the project. You can hire (or skill trade with!) other people to do specific tasks for you, as necessary, and they'll do those specific things.
For example: you want to have the protag chased by neon purple slimes while thundering pipe organ music plays. Working solo, you can have someone make you some neon purple slimes, and have someone compose you some thundering pipe organ music, and no one will ask you why you're combining those two things. In a team, someone probably would XD
The long and short of it is, we've
all got ideas. Very few people are going to want to spend their time doing exactly what someone else wants when they're not getting paid to do it. (See the "
Why Does No One Want To Help Me Make My Game?" thread.)
---
From a technical standpoint, Turan and Andar are spot on. You have one project manager, the person in charge of putting it all together, and the project manager designates numbers of things for each team member to work with. A gets maps 1-20, B gets maps 21-40, C gets maps 41-60. A gets switches 50-99, B gets switches 100-149, C gets switches 150-199, and switches 1-49 are reserved for running [specific thing].
You also need to have things like style guides (so all your artwork goes together), naming guides (so you can easily use placeholders), and especially an understanding of how you're going to name your project files. If the project manager names the builds by date, it's going to be confusing if a team member numbers them 1, 2, 3 or 1, 1.1, 1.1.1, 1.1.2, etc.
But above all, man: communication, communication, communication. It is a skill and it has to be practiced, but it is
so important. Good communication is what ensures that everyone on the team has access to all the necessary information and isn't shy about asking questions when something doesn't make sense.
---
In my personal experience, hobby team projects (money is not changing hands) work best with small teams, and when everyone has an equal share in the creation of the idea. That is to say, one person doesn't have a massive design document written and "just needs a mapper, eventer, composer, spriter, and programmer" to make it happen. When everyone is equally excited about the idea and has their own zone in which they can exercise some creative autonomy, everyone feels like their contribution is valued.