Version Control: 400MB New Project

Hi,


In VX Ace, since the RTP was separate from the actual game content, it was easy to version-control: just commit your project folder, any custom assets, and you're good.


With MV, it seems like each project includes everything from the RTP (minus the base resources stuff); a new project is roughly 400MB.


How are other people dealing with this? Committing 400MB for each new project is not ideal, and while I could trim stuff I don't use, it would be a bunch of manual work to re-add things later once I start using different sprites/characters/etc.
What I do is I have a barebones MV version, then just add files as needed. Afraid that is really the only way, as the RTP is now included in your files.
yep.  I create a new project and immediately go in and delete all the resources.  Got to go through the System tab and set everything to no sound effects or see what you want and add it back, as well as the img/system file, or you won't be able to launch your game.  Then I add them back as I need them.

Original thread: https://forums.rpgmakerweb.com/threads/version-control-400mb-new-project.73028/