Help transferring an existing project into a new project file

About a month ago I encountered a glitch with Ace and long story short, I ended up having to import all the default resources into my project as a "fix". Unfortunately, this ended up tripling the size of the game.

Now, if I create an entirely new project, the new one doesn't have the glitch that required me to import all the default stuff. So my question is, how do I transfer all of the stuff I've already made on the glitched project into a new one, to bring the filesize back down to normal? Things like the database and my maps and stuff. (Well with the maps it's probably just a copy/paste job, isn't it.)
Copy your Data folder from the original game into the new one.


Do the same for Audio and Graphics, but ONLY for resources you have imported - leave the RTP stuff out.


Your other project was probably so big because, in addition to importing all the RTP, you probably still had 'include RTP' checked when you compressed it, so it actually included the RTP twice.
That was easier than I expected. Now my filesize is down to a reasonable 43 megabytes instead of 171 (it got bigger than I thought o.o). The RTP by itself is pretty large it seems.
I'd say this topic can be closed now. But I'd appreciate it if someone could maybe take a look at my other unresolved threads and see if they can help with some of my other issues since the people who were helping me just kinda left me hanging.
This thread is being closed, due to being solved. If for some reason you would like this thread re-opened, please report this post and leave a message why. Thank you.

Original thread: https://forums.rpgmakerweb.com/threads/help-transferring-an-existing-project-into-a-new-project-file.16880/