Not sure if this is worthy of a discussion or just a simple question, but how do version numbers even work? Like, Project A v1.5? I had a school friend playtest a project of mine and he mentioned the numbers I use are weird. Is there just an unspoken rule on how/when to change the numbers, or is it just whatever?
I usually make the very first version v1.0, and I increase the decimal depending on how much has been changed between the two versions.
That makes sense. At least now I have a term for it. Semantic versioning.
I wouldn't be able to tell you if its an Apple thing or not. I don't know that much about it.
Basically you can indeed do whatever you want. There are some guidelines, however (haven't read that link, maybe I,ll be repeating, sorry):
The first number is a major version. When you hit "1.0", it means your game is playable from start to finish, it is "complete". It doesn't mean you won't ever do any fixes or add stuff in, but it'll generally be relatively minor things. To pass to "2.0" you would've had to upgrade your game so much is basically a different game. Think starcraft 1 vs starcraft 2 or RM2k vs RM2k3. It's been upgraded and changed so much it's just not the same thing anymore.
The second number is minor versions and it can be pretty much anything you want. It has had enough upgrades to warrant it having its own number, being a step higher, but really it's you who define what 'enough upgrade" represents. Generally I think a good rule of thumb could be when you've implemented a new system or functionnality, maybe completed a whole new chapter story-wise, something like this. Be wary that these are not decimals. When you reach 1.9, the next step is not 2.0, it is 1.10. Hence 1.1 < 1.2 < 1.10 (for exemple).
A third number is really up to you, depending on how you want to define what "enough improvement" is and how you want your versioning to work. Same goes for the use of letters. Some people use them to signify a minor fix. For exemple : "In 1.10.0 we introduced an alchemy system, in 1.10.1 we added a bunch of components and recipes, and in 1.10.1a we fixed a game-breaking bug with some recipe that had slipped through our fingers".
But really, in the end, it's up to you.
As already said their is no written law how to use version numbers, as I know. A common rule is, a number under 1.0 will be a program in beta state needs more testing for a big public release. But I know many - mostly open source - software with lower numbers than 1.0 but working perfectly.
Well, Microsoft's Visual Studio uses a 4-part system of Major.Minor.Build.Revision for example.
I'm using this system like this: The major number will be increased on real big changes like using a new framework or a rewritten core. So most changes like new basic functions are made with the minor number. The Build number I increase for releases wirh enhancements of existing function like new options or additional parameters. And finally the revision will be increased on every bugfix.
Just to be safe: If I increase the minor number, for example, build and revision will be set to zero.
(e.g. 1.2.5.0 -> 1.2.5.1 -> 1.2.5.2 -> 1.2.6.0 -> 1.3.0.0 -> 1.3.0.1 ...)
But as I said, this is just my way. You can use your own system like you want.