If my friend and I both have RPG Maker MV, both paid for of course, can we share both switches and maps between projects?

As in can we take switches and maps from one project, like in the game folder, and move it into another game folder, will he be able to have the switches and maps in his? Like if i make maps, with switches, is there a way of putting them into the project he has? Where what I did is in his project.

We're working on a game together but we have our own copies so I dont have to be at his place. That way we can work on different maps and get the game done faster, two people working on it instead one. To do that though it has to be possible to transfer from my project, in a folder or something, maps with switches over to his where he can put them, both switches and maps, into his project.

Like we have two different project files. He has the main one on his computer, the actual project file, and I volunteered to work on maps in my project and I will send them over, with the switches, if that's possible. So we're not using the same project file.

The idea is for me to just send over the switches and maps and put them into the project file that he has.
You can copy and paste maps from other projects, the events carry over. I don't see why you couldn't do what your saying. I would get a good flash drive and copy the project your working on to it periodically. Then bring it to him to open, then copy/paste any maps he wants for the main project file. (your secondary project could be updated at the same time too if you wanted.)
You can also work together by uploading it to Dropbox or something. Just be cautious you don't overwrite each other's work.
I meant like do the switches carry over too. Because the events will be referencing switches. Like if that Switch is On do this, and this Switch is Off do that.

Those have to be transferred over too. Can i also send over the switches because the Events in the maps will be referencing switches. Without having to recreate the switches in his project. As in just copy and paste them over without having to recreate all of them.
If I recall (I actually did this before, but can't remember exactly) You'll have to coordinate and copy/paste switches.

If your friend uses switches 1-100 and you use 101-200, it should prove pretty simple and straight forward. (it wouldn't have to be that number exactly, but you get the idea)
Yeah, you can open up your friend's version of the project, open the switches page, copy the ones you want to use, go over to your version of the project and paste them, same as you do with maps or any other database items (just be sure to put them into the same place so it's not trying to call on the wrong switches).

Alternatively, if only one of you is going to be working on the project at a time (and this would need to be coordinated so that two people were not working on it at the same time or else you would have to switch to the copy/pasting system), you could have the one person do their work, save the project, upload it (Google Drive is probably your best bet), then the second person could download it, do their work, save and reupload it when they're done so the first person could download it and resume their work.
You can also work together by uploading it to Dropbox or something. Just be cautious you don't overwrite each other's work.

We're not working with the same project file. We have two different project files. Like he has his on his computer and I have mine. I would just be creating maps and switches and mine and sending them over to his, so he can put them into the main project file. But it's too project files.
How would you copy and paste switches? Oh re-create them in the project. Is there a direct way to copy and paste switches or would it have to be manual? Like looking at one project, moving over, and doing it in another project? Like looking at one project, going over to the other one, and re-creating it over there. Like manually, instead of copy and paste directly.

I don't get what you mean by going to one copying it and pasting in another. We would have the projects open on two different computers. Like two different computers. Getting the switches on mine, that are referenced in the events, over to his.

We can try coordinating events but to be on the safe side I would go into the 1,000's. to make sure that I dont run over the events he's using.

@PhoenixHeart87 , please avoid double posting, as it is against the forum rules. You can use the "Edit" function on your posts to add additional information you've forgotten or respond to multiple people. You can review our forum rules here. Thank you.


That's posting right after yourself without someone posting in between. You can go back and edit it if you need to add more.

And if not using Dropbox or similar for the whole project, you can share map files that way. I was just offering it as an alternative to needing to physically exchange a USB drive or something similar.

As for copying the events - while I admittedly don't have the most experience, you can copy map files. So, if you go into your project file, and copy the map file for Map001 or however they are named and send it to your friend, it should retain events. The difficulty lies in that your friend will need to have corresponding maps on their project. I believe if say, you send the file for Map010 and they only have three maps created, it will not show up in their editor. They will need to create a "dummy map" that has the same number as the map file you are sending them. Once they put the map file into their project, the map will properly show up.

As for switches and variables, I've not played with it really, but based on what the member above was saying and the limited experience with this I do have, I would think that as long as you do not use the same variables or switches as the other person, they should transfer fine. That data should be in the map files. So again, just communicate well. For example, perhaps you could designate switches 1-50 for your partner to use and you could be limited to 51-100 (or whatever you choose). This way, you don't have to worry about your events negatively effecting theirs or vice versa.
You can just highlight, copy and then paste your switches over to his project files, as long as the events are the same and the switches reside in the same spot and order it should work. Just open both files on one PC, copy and paste.
Thank you all for your responses! It sounds like we're going to have coordinate switches, or copy and paste. Even if we do copy and paste on the same computer, we are going to have to coordinate. Because if we copy one from mine to his, the number might be different. Which means going through every event and changing the numbers.

This was still helpful, thank you everyone one and all. I'll let him know.
usually what teams do is keep one master-copy where no one works on, make sure everyone works on different parts of the project and then copy the changes back to the master in regular time intervals. And after each copy to the master, everyone copies the master over their working copy to get that updated for the future as well.
You still have to coordinate so that you don't work on the same files, but that is the best way to keep everything up-to-date.
usually what teams do is keep one master-copy where no one works on, make sure everyone works on different parts of the project and then copy the changes back to the master in regular time intervals. And after each copy to the master, everyone copies the master over their working copy to get that updated for the future as well.
You still have to coordinate so that you don't work on the same files, but that is the best way to keep everything up-to-date.

That would still involve keeping track of switch numbers though. People would still have to be assigned switch numbers. I think what we're going to do is I'll work on the maps and all of us will decide what events will have switches and which ones won't.

Coordinating switch numbers and who uses what won't be possible, unfortunatley.
why would that be impossible? just assign each one a batch of switches, variables and maps (team member #1 uses 1-20, #2 uses 21-40 and so on) and when someone has used up his assignments he gets a new batch from the last number. This will only require one leader to record which batch is given whom and places the names on the master copy when they are reported back.
why would that be impossible? just assign each one a batch of switches, variables and maps (team member #1 uses 1-20, #2 uses 21-40 and so on) and when someone has used up his assignments he gets a new batch from the last number. This will only require one leader to record which batch is given whom and places the names on the master copy when they are reported back.

Because we won't know ahead of time how many switches we're going to need. Like we won't know how many we will need for what we're doing.

Is there anyway to copy and paste Switches over and change them when you change the switch? Or cut a paste a switch? so if you cut it from x and paste it in y it changes it in the Event?

Now I found out theres no way to copy and paste maps into another project? do I have to copy and paste copy and paste the maps till I get to ids that havent been used? and do they have to copy and past copy and paste to create maps with ids that have ids that match the ids i have if i copy and paste till i get the id that's just right.

That's ridiculous. Can't we just go into data and edit the map ID? what the actual ****?

So if you want to collaborate you have to time it down to the second with the main project folder, or copy and paste ad infintium until you get just the right number in the main project and with the one you want to copy over. We want the freedom to work on it when we work on it, so we can be working on it at the same time. that means no passing the project file around.

And the only other way is to copy and paste copy and paste? that's ridiculous. that you can't just rename the ID. Say you have 200 maps. If your'e map is 5 you have to copy and paste copy and paste till you get it too 201? so you can put it over into the other one.

Don't tell me we have to copy and paste repeatedly constantly to get the right id.

What happens when you get into the hundreds or even several dozens? Is the only way to copy maps is to copy and paste till you get the number that's just right? to copy and paste them over.
of course you can copy mapfiles, and it doesn't matter how many switches your project will need. You just need to work from one mastercopy and coordinate once a month or so.

Make one master project. Create a hundred (empty) maps in it. Tell team member 1 that he can use maps 1-20, team member two to use maps 21-40, team member 3 to use maps 41-60.
If team member three is finished with his maps first, give him 61-80 next, and if team member two is finished after that, give him maps 81-100. and whoever is finished next after that gets 101-120.
Do the same with switches and variables -you don need to know how many maps or switches there will be for adding and assigning the next batch.
And whenever someone is finished, copy the mapfiles onto the mastercopy and whenever someone is finished with a batch, he gets the current master copz for the next batch - that will work, including copying the mapfiles only, no need to edit or manually copy the maps themselves, only the mapfiles need to be copied into the master.