I need to verify that my observations aren't leading me astray and that I am, in fact, seeing things for how they're actually happening. Someone please sanity check me on the following...
If multiple map events attempt to run the same common event simultaneously, the lowest numbered event will begin running it first, correct?
I'm using common events for handling various tasks (like requesting a random number between specific variable values) and I just want to be sure I know how the order of events will happen.
When events run, they do so in event id order. However, whether they will call the common event in the same order depends on what happens within the events themselves - anything that does any kind of pause will allow a higher-numbered event to jump in ahead while the event is pausing (for example, the Wait command, or a move route, will allow other events to continue running while this one is in the wait stage).
I would not rely on them running the common event in the same order.
Having multiple events call the same common event that uses or updates a variable, and then the events doing something to that variable, is always a risky thing. If they happen to be running at the same time, you could have one that sets the variable to something, then before it gets a chance to check what it is, another will change it.
One thing you could do is to get yourself a "self variables" plugin, and use the self variables in the event and common event. That way, regardless of the order in which they run, the common event called from one event will always only modify that event's self variables, and nobody else's. Yanfly has one that looks nice and easy, and doesn't require his core engine.
It depends on what you're trying to do though.
As additional info, you might want to read through the "bughunting" tutorial in my signature.
It contains some background info on timing problems that might be helpfull as well.