I've eaten in the gunny's galley on board the Kitty Hawk back in the late 60's , it was said that it was better than the captain's galley and I have to admit it was pretty good although they were in port at the time so I can't really compare it to underway food . Plus having only eaten it once I had no time to get burnt out on it , that is one thing I tend to get burnt out on certain foods if I have to eat them too often . My ex used to make spaghetti every week and after about 6 months of that I didn't want to ever see spaghetti again , I'm only now after several years able to eat it again .
For space unless some form of centrifuge is created for cooking (that might work even) most things would be prepared on earth well ahead of time and either freeze dried or vacuum sealed . We've all seen the squeeze pouches of food but I think with commercial hitting space new methods of containment and varieties of available foods will increase dramatically . But I am sure that at some point withing the next few years that's something Bigelow will need to address if he want's a hotel in space , if your a good cook you should come up with some good ideas/methods/recipes and pitch them to any and all space faring entities . It's a fairly new thing so there's plenty of room for an inventive person to make a name for themselves in the space food business .
You will also need methodologies for capturing the food vapors and filter them out before they are released into the cabin. I am sure that the submarine galley has equipment to do this to keep from smelling up the whole sub. I can’t think that a long duration, one to several years, would be anything else but a spinning environment that would have ¼ to 1 full G. A microwave device that cooks prepackaged foods or even fresh vegetables in specialized containers shouldn’t be too difficult. A standard attachment in the inside of the microwave that sucks off the steam and filters it, even possibly recovering the water, I think would be the most nominal solution.
I was curious about Bigelow’s cash flow and business model so I did a little cash flow modeling using construction loans to push costs to years where revenue for the item produce would start delaying the total out of pocket to just the loan payments and earnest monies for scheduling rocket flights (from Space X). I included in the leasing agreement price, Bigelow supping the station resupply. Lease for a three person station space set at $395 million a year not including the transport of crew. If everything goes as planned then Bigelow could be earning a PROFIT of over $1 billion a year in ten years from now. That’s profit not revenue. Revenue would be about $4 billion, giving Bigelow a 25% profit margin which is about right for a high risk tech company.The highest cumulative total of out of pocket being ~$75 million for Bigelow in 2013, by 2015 a small cumulative profit from the station project would occur but if earlier years of development expense is also added then it may be until 2017 before this happens. At the end of 2020 Bigelow’s cumulative profit would be ~$3.5 billion!!!! Bigelow could easily drop the yearly lease price so that profit margins of only 15% to 20% would occur to attract even more lease customers. The rate of modules delivered to orbit in the cash flow model is of just one per year starting in 2014 for a total of 2 Sundancer, 4 BA330 and 2 docking modules.
The interesting thing about all of this is that Bigelow would be purchasing $2.5 billion in launch services from Space X or others that does not include HSF crew rotation. That’s putting up modules but mostly resupply missions, so many in fact that a Falcon 9 Heavy would have to be used instead of a Falcon 9 just to keep up with the cargo demand. A triple sized Dragon cargo module holding three times the cargo of a regular Dragon on top of a Falcon 9 Heavy. In ten years there would not be just one or two Falcon 9 Heavy flights needed for this support but 12! There would be at least 12 regular Falcon 9 flights a year too for support. Space X’s profit from this activity would be large enough for them to fund out of pocket the $1.5 billion to develop the Merlin 2 and Falcon X by 2020. The development project would start in 2016. The first Falcon 9 Heavy for use to put up a BA330 would be 2017. None of these schedule or assumptions are highly optimistic, actually they are pessimistic in that expansion or development of advanced hardware would not occur until sufficient profit occurred to be able to reinvest toward development.
If you were wondering about my expertise in doing cost and cash flow estimations of a tech company, I am an Electrical Engineer, also a Software Engineer that did financial software applications, and have been heavily exposed to business accounting methodologies and techniques for managing business finances.
Bigelow is going to work with Boeing and Atlas V. That is stated by Bigelow. However, Mr. Big has stated several times that he is not going to have just one launcher (good business man that he is). So yes, he will give work to SpaceX when that comes around.
There is no doubt that Atlas V is much further along than Falcon, however, the problem in the past has been cost plus contracts. You will never get the best price if you do cost plus. So I think where spaceX will be very important to the lunch business is that they are going to be very price competitive. That will force others to bring their prices down (including the Russians).
I am certain that as SpaceX gets its space legs under it, Bigelow will be more than happy to throw business at them.
Boris
You have two kinds of pictures for the BA-2100 in this thread. One with decks horizontal, and one with decks vertical.
It seems that the newer pictures from Bigelow seem to favor the horizontal decking. Do you know if the decking is yet to be determined? Or has the decking been chosen by Bigelow to be horizontal?
Thanks
Two questions.
Does anyone have a link to a pickure of a Bigelow module with horizontally arranged decks?
Does anyone knwo what the status of the Genesis modules is? Are they still inflated?
Thanks
Do they have plans to actually use the Genesis modules?
First it was said that BA-2100 would mass out at 100 MT, now they quote as light as 70 MT, launchable on NASA's proposed HLV. This is getting intdresting.....
There was a January 1987 JBIS article that discussed a 10m x 6mm Large Volume Habitability Module.
It suggested the horizontal or high-rise configuration of the floors would have a better utilisation of the available extra diameter rather than a longitudinal arrangement - don't know whether there is a diameter where that is reversed.....
Suppose a module is a perfect cillinder, 10x6 meters. Suppose the central section is 2 meters wide.
If you position the floors vertically (that is, each floor is the same size), each floor 2,5m in height, you can get four round floors, for a total of 99.39 m²
If you position the floors horizontally (as seen in the BA-2100 config), the first floor must be a few centimeters offset from the wall (otherwise you would be walking on the inside of a sloped surface).
Lets say the first floor is 20 cm offset. It will be rectangular and 20m² in area.
The next floor, 2.5m above, will lose a big part of its area due to the central core. It will consist of TWO rectangles, each one also about 20 m²
But you cant have a third 20m² floor, 2.5 meters above, for it will be only 80cm high!
In fact, even the first floor would have problems, for the central core would be 1,8 meters above the floor.
The best solution, for horizontal positioning, in terms of floor area, would only work for zero G configs (where floor area is not that important anyway, unlike in configs for lunar or martian bases)
Basically, you have two rectangular floors at each side of central 2 meters torus. Each floors will be 56m². But people´s heads will always turned towards the central core.
Between then, you have a lower ceiling floors, of 2m, divided by the central core in two. Disconsidering the area made unavailable by the central core, the total area would be around 30m² for this floor.
The total floor area thus would be around 142m²
Of course, its not even realistic imho to be talking about floor space for a zero g space station. It only becomes important if you are talking about a planetary station (or maybe, a spinning artificial gravity module for a space station or interplanetary ship).
In THOSE cases where gravity plays a role, and you have to measure in terms of floor space, it seems to me that at least in the smaller modules cases, the vertical floor setup (round shaped floors) provide most space.
If anyone can get me the dimensions of the BA2100 module, I can do some 3d graphs of the different floor configurations...