pathfinder_01":npivyjm7 said:
ATK isn't on Obama's list. ARES 1 and the constellation program is. NASA failed to deliver a shuttle replacement in a timely manner. The two year gap became a five year gap and mostly because of the problems of trying to use a solid fueled rocket as a first stage(few rockets do this esp. ones that need to lift a lot of load). The moon landings moved from in the future to so far in the future as to be untenable. By 2030 the chinese may be doing warp drive tests....
I remain convinced that Ares I, etc., would have gotten the job done. The problem with Constellation wasn't technical, it was money.
Here is the dirty secret. The problem still is money.
ISS commercial crew launch will cost less, or had better cost less, than Ares/Orion because the spacecraft will weigh only one-third as much (or should). Except it won't cost less because Obama has decided to "save" Orion by replacing it with *two* costly spacecraft development efforts (commercial crew and Orion "Lite"). Where is the money (money clearly assigned to save jobs in Colorado while others lose jobs in Utah and Louisiana, etc.) for all of this going to come from?
Meanwhile NASA, if it wants to go beyond LEO, will still need a super heavy lifter that it will not be able to afford as long as this White House and this Congress control the purse strings.
As for when the U.S. will land on the Moon? Obama's plan is to *not* land on the Moon. Ever.
- Ed Kyle