jimoutofthebox":pmuom1s3 said:
Concerning the LH2 stage. Every thing I've read indicates that there is no storable fuel the will give even close to the same performance as a LH2 booster even considering the extra structure to hold the LH2. Thats why the Centaur is the standard booster for high performance missions. That also why I propose a "fat" Centaur as a TLI booster.
A UDMH/Nitric Acid engine ISP 290 to 310. RP1/LOX engine ~350 and LH2/LOX ISP ~450. In order to keep the LH2 and LOX for extended periods > 1 day a regenerative cooler would be needed adding its weight and the solar cells to power it. Why do you think that Apollo used Hydrazine for the command module and Lunar Lander?
For a construct in LEO BEO mission where parts and fuel may be in orbit for months without a buildup of an orbiting LH2/LOX fuel depot, use of LH2/LOX for the TLI booster is not practical. But if you build a fuel depot first then the problems of boil off can be handled.
jimoutofthebox":pmuom1s3 said:
What I propose would be 4 Falcon 9s in a quad arrangement. At lift off two of the boosters would feed all four engine clusters. When the tanks run dry the boosters would be dropped and the two remaining boosters would continue to fire with full tanks. This would be much like the Atlas system except the tanks and the engines would be dropped instead of the just the engines. There should be no need to redesign the Falcon since all the load from the booster is going into the 2nd stage adapter. There would be no core booster to carry the load.
A Falcon 9 first stage is currently designed to operate in the Heavy configuration with all the attach points liftoff loads calculated for a max payload of ~35MT with some margin. That margin is not going to cover a 55MT payload. The first stage would have to be redesigned. One of the main design policy items of SpaceX is economy of scale and not making things overly complex. Boosters that are different than the core increase complexity and lessen the economy of scale.
jimoutofthebox":pmuom1s3 said:
While it would be nice to be able to afford a new monster booster I would rather use what we already have so that I might see the day when we are going to the moon and mars on regular basis.
I agree that a redesign of the Falcon 9 first stage core would not be as costly as a whole new booster with a new Merlin 2 engine, but the effort does not lead to a capability that can evolve to even larger payload capability. That makes it a “no-go” for a business decision. A Falcon 9 Heavy with 32MT will cost very little to become operational; mainly pad mods and a first flight / flight test. Same would be true of a Falcon X Heavy once the Falcon X core is developed. You get two vehicle classes for the price of one.
An upgrade path for the Falcon 9 going from the Merlin to the Merlin 2 gives more performance for both Falcon 9 and Falcon 9 Heavy with a small redesign of the thrust supports and piping on the aft end of the first stage. The tanks would not be redesigned. Like the Falcon 1 it would give an inexpensive way to prove out the Merlin 2 before clustering it on a Falcon X.
Once the COTS flights get going in earnest, SpaceX will have enough profits to reinvest in the Merlin 2 development on the order of $50 to $100 mil a year. If someone expresses a desire to purchase a Falcon 9 Heavy flight in the next year, then these reinvestment moneys would go to the pad mods and other items not done yet to support a Falcon 9 Heavy, which would delay start of the Merlin 2 development. At the possible development rate for the Merlin 2 it will be ~10 years before Space X rolls out a Falcon X, unless the US government subsidizes the Merlin 2 development on the tune of $100 mil or more per year. Then the earliest for a Falcon X would be 2016, followed a year or more later by the Falcon X Heavy ~2018.
So why aren’t we doing that? NASA wants detail control over the HLLV design customizing it to their mission, not designing the mission to fit an “off-the-shelf” HLLV generic booster.