It doesn't cost billions to launch the shuttle. If you divide the total cost of the program by the total number of flights you get about a billion dollars. But most of that is sunk cost or overhead. It costs about $2 billion a year for program overhead and about $165 million for each flight. The total average per flight is typically around $350 million but cold go lower at a high flight rate. So as long as we are going to keep the program going it makes sense to fly as often as possible. And as long as the Shuttle is flying (at this point 2 or at most 3 flights) it makes sense to keep LC-39 as it is.
Terminating the shuttle, now that it's finally flying like it's on rails, was one of the most bizarre decisions of the Bush administration. But we must be clear. Mike Griffin also ordered the Space Station canceled in 2010, as soon as it was finished, which was equally absurd, and without the Station there was nowhere for Shuttle to go, so it was hard to argue the case. What is inexplicable to me is that the thousands of NASA and contractor workers who should have objected to destroying all their work just accepted it like sheep. Now that the party in power has changed, they blame the administration for everything. But with ISS cancelled there was no need for Shuttle. When the ISS was extended, Shuttle should have been extended as well, but instead Orion/Ares was allowed to morph into the role of ISS logistics, for which it was not designed and is singularly unsuitable.
Almost as bizarre, Augustine, when asked by Nelson, specifically offered shuttle extension as an alternative, and even pointed out, correctly, that if Shuttle were extended it would make sense to go ahead with the sidemount HLV concept since it could use the same infrastructure and launch complex. Yet bizarrely, he didn't include this among his formal "laundry list" of choices.
If Shuttle is canceled it does not make sense to continue to use any part of LC-39. The overhead and maintenance are much higher than a modern single-vehicle pad with horizontal integration. We tell all the visitors the crawlers are the eighth wonder of the world, but in reality a system using steel rails, as are used at almost every other launch site in the world, would be much less expensive to maintain.
So it seems like a waste of money to spend billions to "refurbish" LC-39 as is now planned. All the currently planned launch vehicles already have processing facilities, and if a new vehicle is needed it would make more sense to design a new processing facility around it to minimize operating cost.
>>Failures in VentureStar's technology demonstrator, the X-33, in particular with the composite LH2 (liquid hydrogen) tank, led to program cancellation as a federal undertaking on March 1, 2001.
Composite liquid hydrogen tanks are obviously feasible since one was used multiple times in the DC-X. It might be more reasonable to say that the X-33 program was canceled by the NASA program manager because he did not understand the meaning of the letter "X".
http://www.nasaspaceflight.com/2006/01/ ... -happened/
http://forum.nasaspaceflight.com/index.php?topic=1184.0