STATUS REPORT
Date Released: Sunday, July 4, 2010
Source:
NASA HQ
All ISS systems continue to function nominally, except those noted previously or below. U.S. Independence Day.
Sunday – Crew sleep cycle is shifting left to return to nominal: Wake – 7:00am (reg. 2:00am), Sleep – 8:30pm (reg. 5:30pm) EDT.
Yest kasaniye! At 12:17pm EDT, Progress M-06M(38P) docked successfully to the SM (Service Module) aft port under KURS autopilot control, followed by a final DPO post-contact thrusting burn, docking probe retraction and hook closure (“sborka”) after motion damp-out while the ISS was in free drift for ~20 min (12:17pm-12:37pm). At “hooks closed” signal, the SM returned to active attitude control, maneuvering the ISS to LVLH TEA (local vertical/local horizontal Torque Equilibrium Attitude) at ~12:37pm. Control authority returns to US Momentum Management at ~2:10pm. Russian thrusters will be disabled temporarily during clamps install and leak check (2:10pm-4:10pm). [This was the second docking attempt after yesterday’s aborted linkup, now traced to an interruption of the TORU radio signal by the SM’s Klest/Simvol television system. The dropout of the TORU teleoperated rendezvous & docking system then generated the command “cancel dynamic operations” which aborted KURS automatic rendezvous mode and switched Progress to a safe, passive flightpath, as designed. For today’s docking, TORU, which is usually in “hot standby” mode during Kurs-controlled dockings, was not activated.]
For monitoring 38P rendezvous & docking, CDR Skvortsov & FE-2 Caldwell-Dyson had set up the Ku-band video “scheme” for covering the Progress docking, activating the FGB-based A31p SSC (Station Support Computer) laptop for the TV conversion to NTSC & Ku-band of the RS (Russian Segment) video signal from the SONY HDV camera via the MPEG-2 (Moving Pictures Expert Group 2) encoder from FGB & SM, in order to downlink “streaming video” packets via U.S. OpsLAN and Ku-band.
Approach & docking as seen from the +X (backward facing) SM TV camera was monitored by Alexander as always on the SSC1 (Station Support Computer 1) laptop using the NVIEWER (NASA Viewer) software application.
Before docking, FE-4 Wheelock shut down the amateur/ham radio equipment (~9:05am) to prevent RF interference with the Progress KURS radio control system. [The protective shutters of the Lab, Kibo & Cupola science windows were already closed last night.]
Tracy Caldwell-Dyson worked with Alex to tear down and remove the MPEG-2 “schemes” streaming video downlink setup, then deactivated the conversion A31p laptop in the FGB.
At ~2:10pm-3:25pm, the crew conducts the standard one-hour leak checking of the docking vestibule and fuel/oxidizer transfer line interface between Progress and SM/aft.