2nd 60-day study

Griffin kicked off two 60-day studies: ESAS which has now been revealed and Shuttle/Station Configuration Options Team (SSCOT) for the fly-out of the shuttle, final ISS configuration, and (presumably) ISS use post 2010.<br /><br />What happened to the second 60-day study?<br /><br />It seems that a lot of the questions being "discussed" (I use the term loosely) in other threads will be answered by this study.
Some new information...<br />Seems the report is complete and now Congress etc are being briefed on it.<br />19 flights maximum, including one to Hubble, and Node 3 is out.<br /><br />Flight International article
No node 3 <img src="/images/icons/frown.gif" /> quick someone call biglow!
Nice find with that article. Shame about Node 3, but the HSM is going to be one to watch for sure - with no safe haven option and the process of servicing Hubble.<br /><br />Has anyone heard anything recently about the ATV? I've either missed it or heard little on how ESA is doing with that.
The ATV is to launch sometime next year.
Tell me about it.Frankly I dont know it.

Original thread: https://forums.space.com/threads/2nd-60-day-study.3144/