Strange that this article did not mention that Starliner will land on land, rather than "splash down" on a body of water. That is something the Russians have been doing all along, but is a first for the U.S. and has some advantages.
But, it seems really sad that Boeing got a contract for 62% more money than SpaceX, and at the same time, yet is more than 2 years behind SpaceX in delivering a working system.
I understand the desire for redundancy, especially after the Space Shuttle Program's disastrous ending. But, given Boeing's other problems with commercial airliners, it still remains to be seen how much additional reliability is attained from the Boeing system.
With other commercial players like Dream Chaser, New Glen, etc. etc., there may soon be a lot more alternatives to chose from.
Not only did Boeing get 62% more than SpaceX, they got an additional $287.2 million in 2019 from NASA when they considered cutting their losses. That brings their total to $5.1 Billion vs SpaceX's $3.1 Billion.
AND on top of all that they're charging nearly 2x per seat than SpaceX - $90 million vs $55 million. Even more than Roscosmos was charging at $80 million. Boeing's snarky justification for the higher cost (they would only compare to Roscosmos) was that domestic launches cost more. Much of that too is the higher cost of the Atlas V. This is why they'll never do commercial launches. Who would pay nearly double per seat? They only ever plan to have 2 capsules and in order to fly on rockets other than the Atlas V someone has to pay for that certification.
There's a good Eric Berger article from 2022 that analyzes the costs over the 6 required missions of the initial contract.
The problem everyone points out with DreamChaser is there is no crewed version (sure, yet) and because it launches INSIDE the payload fairing there's no crew abort available during launch.
Starship will of course be crew certified eventually though it's overkill for the ISS. The Falcon 9 is a now extremely reliable launch vehicle and with continued increases in reusability (2 launched 20 times so now they're targeting 40) they're not going to "discontinue" it anytime soon.
In discussing redundancy, New Glenn is redundant to SpaceX rockets and ULA's Vulcan. These provide lots of options for sending things into orbit. They will all eventually probably be capable of being certified to launch crewed missions.
Something like Dream Chaser would add to the reusability and rapid turn around savings, with landings at regular airstrips instead of splash downs in water or Soyuz type retrorocket touch downs in deserts.
That is where I see this going.
As for StarShip eventually getting to be crew rated, isn't that Musk's ultimate plan? I don't think he intends to send a million people to Mars in Artemis capsules. (Not that I have confidence that he is ever going to send a million people to Mars.) Frankly, if I were an astronaut, I would rather glide down to an airstrip landing than go through a flip maneuver and get grabbed by giant "chop sticks" on a launch/landing tower, though.
In-space facilitation won't need ships for mass ore transport from out of the light gravities of the Moon or near Earth asteroids since "mass drivers" throwing ores to "mass catchers" at construction sites, or even transfer points for attaching remote or AI-auto-piloted controlled electric propulsion to construction sites, will be doing that job. Initial salting with necessary Earth trace elements to the construction sites will be a different story needing lots of ships capable of lifting a lot of tonnage from Earth's surface.
It would nice when we can design laser or microwave (from Earth's surface or even from orbit) controlled tractor beamed elevator transport to orbit for transfers. Just dreaming about next generation transport.