RSS rollback should be underway...looking at NASA TV, I'm not sure. No audio since I tuned in....
STS-125 Hubble Repair Mission (Atlantis) [May 2009?]
International Space StationYep, all quiet on the eastern front.
More streams here (all silent atm?)
150k
http://playlist.yahoo.com/makeplaylist.dll?id=1369080
300k
http://playlist.yahoo.com/makeplaylist.dll?id=1368162
500k
http://playlist.yahoo.com/makeplaylist.dll?id=1368570
1200k
http://playlist.yahoo.com/makeplaylist.dll?id=1368163
More streams here (all silent atm?)
150k
http://playlist.yahoo.com/makeplaylist.dll?id=1369080
300k
http://playlist.yahoo.com/makeplaylist.dll?id=1368162
500k
http://playlist.yahoo.com/makeplaylist.dll?id=1368570
1200k
http://playlist.yahoo.com/makeplaylist.dll?id=1368163
Everything looks great for the launch today. The launch window opens at 2:41 pm EDT but the planned T-0 is 2:01 inorder to get the best boost performance as the launch pad moves under the Hubbles orbital plain.
We will be headed for the river in Titusville in about 2 hours.
We will be headed for the river in Titusville in about 2 hours.
Currently in a planned hold at T-3:00:00, about 4 1/2 hours from launch.
Now out of the hold, T- 3:00:00 and counting....
Keep the updates coming please, I won't get to see it.
Roger Wilco 🙂
Updated targeted launch time is 2:01:56 PM EDT.
Monitoring minor ice buildup on LH2 Umbilical. Trying to examine with cameras, may have to send out ice team to inspect.
FYI, Liquid Hydrogen is at -423 degrees F. 🙂
Weather at Moron, Spain still marginal but improving.
Edit: Moron is now observed and forecast as go!
FYI, Liquid Hydrogen is at -423 degrees F. 🙂
Weather at Moron, Spain still marginal but improving.
Edit: Moron is now observed and forecast as go!
Final Comm check...all loud and clear.
Final throttling information 72% at Mach 0.71, 104% at Mach 1.01.
Ice crew being dispatched to check LH2 umbilical.
T-20:00:00 in planned hold.
Monitoring a wildfire in distance to ensure smoke won't cause a problem with visibility in the event of a RTLS (Return to Launch Site)
Final throttling information 72% at Mach 0.71, 104% at Mach 1.01.
Ice crew being dispatched to check LH2 umbilical.
T-20:00:00 in planned hold.
Monitoring a wildfire in distance to ensure smoke won't cause a problem with visibility in the event of a RTLS (Return to Launch Site)
One hour to launch time.
T-20:00 and counting down to final T - 9:00 hold
Window opens 1:44:28
Target launch time 2:01:56
Window closes 2:43:46
3 short cutouts for orbital debris avoidance at ~ 2:08, 2:19, and 2:21
BTW, all times EDT (UT - 4 hours)
T-20:00 and counting down to final T - 9:00 hold
Window opens 1:44:28
Target launch time 2:01:56
Window closes 2:43:46
3 short cutouts for orbital debris avoidance at ~ 2:08, 2:19, and 2:21
BTW, all times EDT (UT - 4 hours)
Now at the T-9:00:00 hold....
15 minutes left in the T-9 hold. Ice team debriefing underway.
Ice team has given the OK. No constraints to launch.... 🙂
Keeping an eye on cumulus to north of pad...could be a problem. OK at the current time.
Keeping an eye on cumulus to north of pad...could be a problem. OK at the current time.
Final polls underway.. and finished
All go for launch.
All go for launch.
Godspeed Atlantis!!
T - 9:00:00 and counting.
Time to fly!!!!!!!
Time to fly!!!!!!!
MeteorWayne":2zprqo94 said:
Yes! This 1200k stream quality is perfect. This will be nice to watch. 😎
-3.00 good luck Atlantis.
CSPAN 3 is covering it live
LIFTOFF!!!!!!!!!!
SRB Sep
So far so good!
ABC gave me 2 minutes on a 4" B&W.
Great launch, gives me chills every time.
Original thread: https://forums.space.com/threads/sts-125-hubble-repair-mission-atlantis-may-2009.746/