<p>This off load is to trim the for weight and balance of the Orbiter for a possible destack in the VAB if this Hubble servicing flight can not launch inthe Feb/March 2009 time frame.</p><p>Roll back to the VAB is scheduled to start at 0700 hours Monday Oct. 20. That will be a fairly rare day light Shuttle stack move if the weather co-operates.</p> <div class="Discussion_UserSignature"> </div>
OMS/RCS fuel off load is in work
Our Solar System<p><BR/>Replying to:<BR/><DIV CLASS='Discussion_PostQuote'>This off load is to trim the for weight and balance of the Orbiter for a possible destack in the VAB if this Hubble servicing flight can not launch inthe Feb/March 2009 time frame.Roll back to the VAB is scheduled to start at 0700 hours Monday Oct. 20. That will be a fairly rare day light Shuttle stack move if the weather co-operates. <br />Posted by shuttle_guy</DIV></p><p>This post was intended to be on the STS-125. I will duplicate it in the STS-125 thread.</p><p>This thread can be deleted.</p><p> </p><p> </p> <div class="Discussion_UserSignature"> </div>
Original thread: https://forums.space.com/threads/oms-rcs-fuel-off-load-is-in-work.881/